The grid road happens in rolls or cards. Road mesh is used in the construction of roads, for reinforcing asphalt pavements, bridge building, airfield construction and other industries where hardening, reliability and durability of products are required.
For the construction of roads, plastic road mesh can also be used.
Material for this type of metal mesh : low-carbon wire with a diameter of 3.0-5.0 mm, wire VR-1 with a diameter of 4-5 mm (sometimes wire 6 mm).
Studies conducted by road specialists show the following: reinforcement with road mesh prevents and reduces the occurrence of reflected cracks, if slight cracking occurs, then it is much less than on unreinforced road surfaces. The best results were obtained when reinforcing with a road mesh with an average wire thickness of 4 mm. In the presence of a road mesh, the number of cracks decreased by 8 times compared to non-reinforced coating layers. The minimum thickness of asphalt in the case of using a road grid is 4.5 cm, while the installation of two-layer pavements using dense asphalt concrete is recommended; the cost of a layer of reinforced asphalt concrete pavement with a thickness of 75 mm is not higher than the cost of an unreinforced pavement with a thickness of 95 mm (in the latter, however, the number of cracks is 5 times greater); in case of minor damage to the base of the pavement, the road mesh can only be laid over seams or cracks with a strip width of 90-120 cm, the road mesh is stretched after unfolding, and then attached to the base of the pavement with steel nails .
It is desirable that the road mesh for reinforcing the layers of asphalt concrete pavements be supplied in cards with a length equal to the width of the pavement, in transport racks.
The grid road keeps within on the leveled old covering without overlapping. To fix the road mesh, an organo-mineral mixture is distributed over it in the amount of 20 kg / m 2. The swollen or curved road mesh must be leveled using a special key. The pavement should be laid in two layers so that unevenness can be eliminated before laying the top layer.
The grid road keeps within on the leveled old covering without overlapping. To fix the road mesh, an organo-mineral mixture is distributed over it in the amount of 20 kg / m 2. The swollen or curved road mesh must be leveled using a special key. The pavement should be laid in two layers so that unevenness can be eliminated before laying the top layer.
![]() | ![]() |